Print this page Email this page
Users Online: 514
Home About us Editorial board Search Browse articles Submit article Instructions Subscribe Contacts Login 
ORIGINAL ARTICLE
Year : 2012  |  Volume : 1  |  Issue : 1  |  Page : 1

Performance evaluation of an Anaerobic Migrating Blanket Reactor in the biodegradation of perchloroethylene from industrial wastewaters


1 Environment Research Center, Isfahan University of Medical Sciences (IUMS), Isfahan, Iran
2 Department of Chemistry, School of Science, University of Isfahan, Isfahan, Iran
3 Department of Biostatistics and Epidemiology, School of Health, IUMS, Isfahan, Iran

Correspondence Address:
Maryam Faraji
Environment Research Center, Isfahan University of Medical Sciences, Isfahan
Iran
Login to access the Email id

Source of Support: Isfahan University of Medical Sciences (project no.389012)., Conflict of Interest: None


Rights and PermissionsRights and Permissions

Aims: The aim of this study is to determine the PCE biodegradation potential in an Anaerobic Migrating Blanket Reactor (AMBR) that has not been used so far for the bioremediation of this compound, in high concentration, and to evaluate the system performance. Materials and Methods: This study was an Experimental - Interventional study that was done from April 2010 to March 2011, in the Isfahan University of Medical Sciences. The AMBR was used in a type of laboratory scale, with a volume of 10 L, which was divided into four compartments, for the biological degradation of PCE in a synthetic substrate. The startup was done using anaerobic digested sewage sludge. The performance of the reactor was evaluated during four periods, with a PCE loading rate of 3.75 until 75 mg PCE/L.d. The hydraulic retention time (HRT) was 32 hours. Results: Optimum chemical oxygen demand (COD) removal efficiency was obtained, 98%, with an organic loading rate (OLR) equal to 3.1 g COD/L.d. For PCE removal, the optimum efficiency was observed to be 99.8%, with a PCE loading rate equal to 37.5 mg PCE/L.d. The average COD and PCE removal rates for the whole activity period of the reactor were 91.4 and 99.5%, respectively; 1.1 ± 0.7% from the influent PCE was adsorbed on the biomass and 20% was found in the headspace. Conclusions: The AMBR reactor, which provides full-scale studies and uses real industrial wastewater polluted with PCE, is a simple, efficient, and reliable method for the treatment of PCE.


[FULL TEXT] [PDF]*
Print this article     Email this article
 Next article
 Previous article
 Table of Contents

 Similar in PUBMED
   Search Pubmed for
   Search in Google Scholar for
 Related articles
 Citation Manager
 Access Statistics
 Reader Comments
 Email Alert *
 Add to My List *
 * Requires registration (Free)
 

 Article Access Statistics
    Viewed3661    
    Printed221    
    Emailed0    
    PDF Downloaded381    
    Comments [Add]    

Recommend this journal